Product: steel bar
Place of shipment: China
|
Steel bar transportation process:
1. Baoshitong logistics company arranges the construction personnel and vehicles to enter the customer's factory, and carries out the construction according to the original loading plan.
2. The construction personnel shall check the transport vehicles according to the requirements and make loading records. At the same time, check whether there is oil stain in the bracket. If there is, it must be cleaned and confirmed.
3. All drivers must obey the arrangement and command of customer service after entering the plant area. After going through the entry registration procedures, they must drive into the operation site step by step and slowly. At night, they must change the light to indicate passing.
4. The steel bars are placed in the middle reasonably without obvious partial load. There is no obvious defect in the appearance of the steel bar, complete identification and no defect in the packing tape
5. The goods shall be accurately delivered and parked according to the destination area (terminal loading point) indicated on the weight list, and the vehicles shall be moved under the command of the on-site personnel, and the unloading volume shall be coordinated with the gantry crane of the bridge. And make sure that the steel bar is completely lifted off the bracket before moving the vehicle